About Us

AARBEE ENGINEERING INDUSTRY is a proprietary establishment. Established by its proprietor D. Balakrishnan at the year of 1989. Presently the company is mainly concentrating on FOOD PROCESSING MACHINES Ie. CHAPPATHI , LAYER PARATHA , IDIAPPAM Making machines and FIBRE EXTRACTING MACHINES Ie. Banana, Pineapple, Sissal, and Hemp.

AARBEE Have grown like a giant during the past 27 years under the guidance of its proprietor. Aarbee is honored and proud to associate with our clientele, one that spans the entire globe. Our esteemed customers are spread across 25 countries. The Aarbee family is 500+ and continually growing.

SOME OF OUR VALUABLE PROJECTS & ACTIVITIES

CROSS LAPPER MACHINE

For jute . Our machine is ancillary machine for DILO NEEDLING MACHINE – GERMAN.

BANANA / PINEAPPLE / SISSAL FIBRE EXTACTOR MACHINE (FULLY AUTOMATIC)

We indigenously developed the machine.

JUTE COIR BLENDED YARN SPINNING

We developed machines in association with our customer.

CONVEYORS

Bucket elevators, Flat conveyors, screw conveyor for handling Bulk materials from one place to another.

GEO TEXTILES

We developed machines for GEO TEXTILE INDUSTRY as below.

  • COIR LOG PRESSING MACHINE.
  • SOIL EROSSION COIR BLANKET
  • JUTE NURSERY BAGS
  • POLY PROPLENE NET for EROSSION BLANKET
  • JUTE FOOT WEAR Etc.

ENGINEERING ACTIVITIES

We have been designing machinery spares, equipments and ancillary machines to our customers

KITCHEN EQUIPMENTS

We are one of the leading MANUFACTURER of ALL TYPES OF KITCHEN EQUIPMENTS & CONSULTANTS.

KITCHEN MACHINARIES

WE ARE PROUD IN SAYING THAT NOW WE ALSO DIVERSIFIED OUR ACTIVITIES IN KITCHEN MACHINARY MANUFACTURING IDIAPPAM MAKING MACHINE, PARATHA MAKING MACHINE, CHAPATI MAKING MACHINE

AARBEE Having very good infrastructure as

Land

Around 60,000 Sq. Ft.

Building

Around 45,000 Sq. Ft.

Man Power

Around  60 persons

Machine shop

Well equipped with CNC Machines

Trial & Quality inspection of our machines

Normally all the machines will be operated for 24 hours dry run ie. without raw material.
Against satisfactory dry run, machine will be operated with raw materials for four hours.
During this trial, machine will be fine tuned. After washing, machine will be packed for dispatch.

Our Products